Related Articles
Hot Concern
Column list

Bridge of rainbow of Shanghai of railroad of Beijing Shanghai high speed stands,

From;  Author:Stand originally

This morning, station of bridge of rainbow of Shanghai of railroad of Beijing Shanghai high speed and relevant engineering go into operation arouse congress is held in Shanghai, the mark is worn times suffer the station of Gao Tiehong bridge that fix eyes upon and relevant project to be under construction on full steam construction.
  
Build station of bridge of rainbow of Shanghai of railroad of Beijing Shanghai high speed to be located in airport of Shanghai rainbow bridge on the west side, it is one of significant key positions of area of railroad Hua Dong, also be Shanghai rainbow bridge the main component of integrated traffic hub, be in Beijing Shanghai, Shanghai to offspring two old trunk railway are handed in collect place. End of north of rainbow bridge station brings railroad of Ning Cheng border of railroad of high speed of the Shanghai that accept capital, Beijing Shanghai railroad, Shanghai; Railroad of border of Hangzhou of special railway line of Hang Yong passenger transport of Na Duan and railroad of Shanghai elder brother, Shanghai, Shanghai conforms. The date of completion of whole project plan such as field of room of station of station of bridge of tall iron rainbow, station and project of railroad of Beijing Shanghai high speed are synchronous, among them, station house-owner body and integrated field project will be in during Shanghai world rich was met 2010, investment is used.
  
Project of station of bridge of tall iron rainbow by build station house-owner system, assist the project such as equipment of field of office building, station to comprise without platform column canopy, north and south. Set high speed field and city border general fast integrated field two cars field, total dimensions is 16 30 lines, among them high speed field 10 19 lines, city border general fast integrated field 6 11 lines. Total floor area makes an appointment with station room 240 thousand square metre.
  
The station of bridge of tall iron rainbow after building has the near future (2020) conduction passenger train arrives send 260 pairs, year send a guest 52.72 million person-time, long-dated (2030) conduction passenger train arrives send 335 pairs, year send a guest the passenger transport ability of 78.38 million person-time. Its building is changed to forming high speed of railroad passenger transportation, public transportation change, perfect fast, convenient passenger transport net, raise railroad shipping mass, stimulative Shanghai has important sense in the economic radiant emitance of Huadong and even whole nation.
  
Regard collect as Gao Tie, aviation, subway, city public transportation the modern rainbow bridge that waits for a variety of carriage means to be an organic whole is integrated the main component of traffic hub, construction of station of bridge of tall iron rainbow will hold to " it is with the person this, the service is carried, strong this brief end, system is optimized, have sth in mind develops " railroad builds new concept. The design inside the station uses large space position, without technology of platform column canopy; Air conditioning system is used
Previous12 Next